Permit record

Building permit leads for contractors

A building permit is a filed intention to build, alter or demolish at one address, published by the city or county before the work starts. It is the most widely available public record in construction, and the most misread: late for the trade on the permit, early for everyone else.

Flat navy-line illustration of stamped permit documents on a drafting table, one orange stamp
In short

Building permits are public record in every US state and in the UK. A permit lead is a permit matched to the owner or manager who will buy the adjacent work, not the contractor who filed it. We read permit feeds daily and send you the ones that fit what you do, with a verified decision-maker.

  • Public record in all 50 states
  • Fields: address, work type, valuation, dates, filing contractor
  • Owner contact is never on the permit; that is the enrichment step
  • FieldClients reads this record in your area every day and sends the leads: $800 to $2,000 a month by area size

What the record is

A building permit is issued by a municipal or county building department when an owner or contractor is authorised to build, alter, demolish, or install mechanical, plumbing or electrical systems at a specific address. The record carries the address, a work description, an estimated value, filing and issue dates, the permit type, and the contractor of record where one is named.

It is public because permitting is a government act. Larger cities publish permits on open-data portals with an API and daily refresh; smaller jurisdictions publish through a search form or a records request, sometimes weeks late. There is no single national permit database, so coverage is assembled city by city.

What a permit does not contain is a way to reach the person who awards the work. Matching the address to the owner entity, then to the person who signs contracts, then to a verified email, is the difference between permit data and a permit lead.

Where it is published

  • City open-data portals. NYC Open Data (DOB job filings and permits), Chicago, Seattle, San Francisco and hundreds of other cities on Socrata or ArcGIS, with CSV export and an API, often refreshed daily.
  • Building department systems. NYC DOB NOW, LA Building and Safety, and county development-services sites with their own search and, sometimes, an API.
  • County records offices. Most non-metro counties: records request, portal or in-person lookup, published in batches.
  • UK planning and building control. Local planning authority registers and the Planning Portal; building-control notices from the council or an approved inspector.

Timing: when to reach out

Demolition permits are the earliest signal because they precede everything on a site. New-building permits come next, then major alterations. For the trade named on the permit, the contractor is usually already chosen, so the permit is a late signal. For every adjacent trade and for the owner account itself, the permit is early: the scope is open, the vendor list is empty, and the person who will award it can be reached now.

What FieldClients does with this record. We read the source daily, match each new record to the account behind it (the management company, owner, or operator), find and verify the decision-maker, and send it to you if it fits what you told us you do. You get the account, the dated record, the reason and a verified decision-maker email. Company phone where listed.

Check your market

Building permit leads: questions

Are building permits public record?

Yes. Building permits are public record in every US state because issuing one is a government act. Most jurisdictions publish them through the city or county building department, and hundreds of larger cities post them on open-data portals you can query or export. The permit itself is public; a verified way to reach the owner or decision-maker behind it is not, and has to be built.

How current is building permit data?

It varies by jurisdiction. Large cities on open-data portals often refresh daily or weekly. Smaller counties post in batches or only answer records requests, so data can lag by weeks. Freshness decides how early you reach the owner, which is why FieldClients reads the daily feeds and treats a batch source as a different product.

Can you get the owner's contact details from a permit?

No. A permit lists the property address and the filing contractor, not a verified phone or email for the owner or decision-maker. To turn a permit into a lead you match the address to the owner entity, identify the person who signs the contract, and verify their email. FieldClients does that matching and delivers a verified decision-maker email on every lead, and a company phone where listed.

Is a permit lead the same as a permit list?

No. A permit list is the records as published, sold to every subscriber in a market. A permit lead is one record matched to one account with a named, verified decision-maker, delivered to one client. Permit lists cost $0 to $150 a month and need someone to work them; FieldClients plans run $800 to $2,000 a month by market and deliver the finished account.

Want this record watched in your area?

Tell us what you do and where. Within 24 hours you get a proposal with your exact rate and 3 to 5 sample leads from your area.

Check your market

Reply within one business day · Month to month, no setup fee